Tools
- T-27 driver (PN 2230), steps 2 and 3
Parts (10)
| Part | Count | Size | Goes in | Note |
|---|---|---|---|---|
| Front foot (PN 1735) | 1 | 61 × 8 × 6 cm | step 2 | The short crossbar with a wheel at each end and a plate with holes in the middle. |
| Long leg (PN 1118) | 1 | 60 × 5 × 2 cm | step 2 | The longer of the two flat leg bars with a slot: 60 cm. |
| Short leg (PN 1117) | 1 | 44 × 5 × 2 cm | step 2 | The shorter of the two flat leg bars; the manual prints no length, so its size here is estimated. |
| Flywheel housing (front unit) | 1 | Ø 56 × 26 cm | step 3 | The big round housing at the front. It comes joined to the frame as one front unit. |
| Front frame with footrests (front unit) | 1 | 98 × 12 × 10 cm | step 3 | The angled frame with the footrests and the Concept2 logo. Part of the front unit, not a separate piece. |
| Monitor arm (front unit) | 1 | Ø 3 × 40 cm | step 3 | The thin arm that holds the monitor and the device holder, already fitted to the front unit. |
| Performance monitor (front unit) | 1 | 24 × 20 × 5 cm | step 3 | The monitor at the top of the arm, screen toward the seat. |
| Rail (with seat and rear legs) | 1 | 136 × 9 × 6 cm | step 4 | The long rail with the RowErg logo. The seat and the rear legs come fitted to it. |
| Seat (on the rail) | 1 | 32 × 28 × 6 cm | step 4 | The seat that rolls along the rail; it comes on the rail. |
| Rear legs (on the rail) | 1 | 46 × 24 × 8 cm | step 4 | The short legs at the far end of the rail, already fitted. |
Hardware (8 pieces)
| Part no. | Hardware | Count | Size | Used in |
|---|---|---|---|---|
| 2233 | Screw 3/4 in (1.9 cm) | ×8 | Ø 6 × 19 mm | steps 2 and 3 |
Sizes are as drawn in the 3D: diameter × length for fasteners, in millimeters.
The 5 steps
-
Step 1: Check your parts
Lay out the front unit (flywheel, frame and monitor in one piece), the rail with the seat, the front foot PN 1735, the legs PN 1117 and PN 1118, the T-27 driver and the 8 screws PN 2233.
Tip: Clear a space of 274 x 122 cm. That is what the rower needs when you use it.
-
Step 2: Fit the two legs to the front foot
Set the front foot PN 1735 on the floor. Place the bottom ends of the long leg PN 1118 and the short leg PN 1117 on its center plate and drive 4 screws PN 2233 with the T-27 driver, two per leg.
Watch out: Do not fully tighten the screws until all 8 are in place, or the legs will not line up with the frame in the next step.
Tip: The long leg is 60 cm. If the two bars look alike, measure them.
-
Step 3: Attach the legs to the front unit
Turn the front unit upside down. Set the foot and legs onto it so the top bracket of each leg sits over its holes, and drive the last 4 screws. With all 8 in, tighten every screw firmly.
Watch out: Tighten all 8 screws now, including the 4 in the foot, before you stand the front unit up.
Tip: The animation shows the front unit upright. Do this on the floor with the unit upside down, as the manual shows.
-
Step 4: Latch the rail onto the front unit
Stand the front unit on its feet. Hold the rail by its front end, lift the latch on the frame and set the rail in so its pin drops into the slot. Let the latch close.
Watch out: Check before you row: the pin must sit all the way in its slot with the latch closed, as in the manual's close-up.
Tip: The manual's drawing is small. If your latch looks different, the goal is the same: pin fully in the slot, latch closed.
-
Step 5: Set up the device holder
Slide your phone or tablet up into the holder on the monitor arm. Loosen the knob to slide the lower bracket up or down until it fits, then tighten the knob. To take the device out, pinch and release.
Watch out: Tighten the knob once the device is in place. The manual marks this as important.
Tip: The free ErgData app adds workouts and more data displays: concept2.com/ergdata.
